Note:
1. Orders not meeting the qualifying criteria will progress at the standard FTTP on Demand build charge.
2. Following notification of the build charge, CPs can choose to proceed or cancel the order (see section 5.1.5 of the price list for the FTTP on Demand survey and design charge, and the cancellation charge policy).
3. No build charge exemption, and no exemption per premises passed applies.
4. Eligibility for inclusion in the trial are orders received and acknowledged with a KCI1 date between 01/12/2021 and 31/05/2022 inclusive only.
5. Qualifying criteria includes: head end capacity and spine capacity exists; distance from either the planned NGA aggregation node or an existing FTTP splitter to the target FTTP on Demand end customer premises is 500m or less.
6. The following do not qualify: Multi Dwelling Unit/Multi Occupancy Unit; FTTP on Demand cluster orders; Orders requiring civils work or presenting DIG (direct in ground) infrastructure; Orders requiring significant internal work as part of the ONT installation (e.g. greater than 30m reach internal wiring).